 |  | 5919 MAIN STREET . NEW PORT RICHEY, FL 34652 . 727.853.1016 |
| TO: | City of New Port Richey City Council | | FROM: | Robert M Rivera – Public Works Director | | DATE: | 7/2/2024 | | RE: | Grand Blvd. Bridge Water and Wastewater Utility Relocation - Engineering Services |
REQUEST:
The request of staff for City Council is to review and consider for approval Task Order No. 4 from Stroud Engineering, Consultants Inc. for design, permitting, plans preparation, and bid document services in the amount not to exceed $91,650.00 for the proposed Grand Blvd. Bridge Water and Wastewater Utility Relocation Project.
DISCUSSION:
In 2019/2020 Pasco County’s engineering division contacted the City’s Public Work’s Department to inform them of the Grand Blvd. Bridge failed inspection report. The report called out structural deficiencies that warranted the bridge’s need for replacement. As City Council may be aware, a city owned 16-inch potable water main and a 12-inch force main are attached to the east and west sides of the bridge. The proposed demolition of the existing bridge and the construction of a new bridge will cause the city to design and build new potable and wastewater facilities and attach those facilities to the newly constructed structure. Design elements include temporary by-pass piping for the potable water facility during construction. Once the east side bridge section is completed the construction and attachment of a permanent potable water facility will be constructed. Prior to the demolition of the west side of the bridge the existing 12-inch force main will be removed. The construction and the attachment of a permanent force main will be constructed subsequent to the completion of the west side bridge section.
RECOMMENDATION:
Approval of the task order is recommended.
BUDGET/FISCAL IMPACT:
Funds for this project are identified in the Water and Sewer Collection’s Capital Construction Fund.
| | | |