Item Coversheet

5919 MAIN STREET .  NEW PORT RICHEY, FL 34652 . 727.853.1016


TO:City of New Port Richey City Council
FROM:Robert M Rivera, Public Works Director
DATE:6/9/2020
RE:2020 Downtown Stormwater Infrastructure Analysis – Downtown East Section of Bridge - Page 3

SUMMARY:

Subsequent to City Council resiliency discussions, staff contracted with Environmental Consulting and Technology, Incorporated (ECT) to perform a Drainage Improvement Evaluation for the downtown redevelopment area east of the Main Street Bridge.  The evaluation identified current stormwater drainage conditions such as, existing stormwater drainage systems, drainage system capacities, system upsizing estimates, and development and redevelopment impacts to the drainage systems.  Mr. Robert Johnson, P.E. of ECT is scheduled to present the analysis at tonight’s City Council work session.




REQUESTED ACTION:

Staff recommends that City Council conduct this work session to review and discuss the analysis.

ATTACHMENTS:
DescriptionType
2020 Downtown Stormwater Infrastructure AnalysisBackup Material