As Council is aware, this project is included in the 2022/2026 Capital Improvement Program. A public meeting was held on October 12, 2021 in the City Council Chambers to gather input from residents prior to the design and construction phases. Subsequent to that meeting and several meetings between staff and City Council, proposed construction improvements along N. River Road have been identified and included in the completed design phase. These improvements include:
1. Removal and replacement of the existing sidewalk on the east side of N. River Road.
2. The milling and narrowing of the existing roadway.
3. Roadway striping for pedestrian crossings and bike lane symbols.
4. Decorative street lighting.
5. Landscape and hardscape.
6. The removal and replacement of existing traffic signage.
7. LED crosswalk at Green Key Road and River Road.
8. The straightening of the intersection located at N. River Road and Veterans Drive.
9. Sod placement at Sims Park